Operating a water well drilling rig machine involves several key steps to ensure efficient drilling and proper installation. First, position the drilling rig at the designated location and secure it for stability. Begin by setting up the drill rods and attaching the drill bit. Next, install and connect the water pipes, ensuring they are securely fastened to prevent leaks. Gradually lower the drill string into the borehole, using the rig’s hydraulic system for smooth operation. Continuously monitor the water flow and pressure, adjusting as needed to optimize drilling efficiency. Proper pipe connection is crucial for maintaining a consistent water supply and achieving successful drilling results.
Email: [email protected]
Mobile (Whasapp/Wechat): 008618638556116